Sleeman Sports Complex – Geoff Henke Olympic Winter Training Centre

Custom Panel

Project Description

Project: Denistone Sleeman Sports Complex – Geoff Henke Olympic Winter Training Centre
Project Location:  Chandler, QLD
Project Size: 370 m2
Architect: Gardner Wetherill Associates
Builder:  Buildcorp

ARCPANEL Elevates Sustainability at the Geoff Henke Olympic Winter Training Centre

Nestled within Brisbane’s Sleeman Sports Complex, the Geoff Henke Olympic Winter Training Centre is a groundbreaking facility, allowing elite athletes to train year-round in Queensland’s warm climate. This world-class venue, the first of its kind in the southern hemisphere, features cutting-edge design and eco-conscious construction—an area where ARCPANEL played a pivotal role.

A Revolutionary Facility for Winter Sports

Completed in 2020, the centre boasts a 34-meter-high, freestanding steel structure with seven jump profiles tailored for different aerial disciplines. Athletes reach speeds of up to 70 km/h, launching up to 17 meters into the air before landing safely in a purpose-built water pool. This facility replicates real-world winter competition conditions, ensuring Australian athletes have a competitive edge.

ARCPANEL’s Contribution to Eco-Friendly Construction

Sustainability was a key consideration in this project, and ARCPANEL’s advanced custom panels were chosen to enhance energy efficiency and durability. Our panels were integrated into the facility’s viewing stands, providing a range of benefits that set this project apart:

  • Exceptional Thermal Performance – With insulation ratings of up to R6.5, ARCPANEL custom panels significantly reduce heat transfer, ensuring a more comfortable and energy-efficient environment.
  • Long Spans for Design Efficiency – Capable of spanning up to 12.5 meters, our custom panels minimized the need for additional structural supports, reducing material usage and construction time.
  • Durability in Harsh Conditions – Engineered for Australia’s extreme climate, ARCPANEL’s custom panels withstand cyclonic winds up to C4 and meet BAL-40 bushfire ratings, making them ideal for this high-exposure site.
  • Rapid Installation for Cost Savings – Prefabrication and easy installation allowed for reduced labor costs and faster project completion, keeping construction timelines on track.

Setting New Standards for Sustainable Sporting Infrastructure

Named in honor of Geoff Henke AO, a pioneer of Australian winter sports, this training facility stands as a testament to innovation and environmental responsibility. By incorporating ARCPANEL’s high-performance custom panel solutions, the project not only supports world-class athletic training but also demonstrates the future of eco-friendly construction in sporting infrastructure.

ARCPANEL is proud to have contributed to this landmark project, reinforcing our commitment to sustainable, efficient, and cutting-edge building solutions.

For more information on how ARCPANEL can enhance your next project, visit arcpanel.com.au.

Need help with any of our products?

Call ARCPANEL for assistance on 1300 200 004 or send an enquiry via our contact page.

Back to Top